Building a promising future through Education

This project addresses the educational and infrastructural goals Rwanda's government has set itself, integrating them within a single orphanage proposed for a site outside Kigali, the country's capital. Rebuilding Rwanda consists of a secondary-level technical school and a prefab housing factory.

HOUSING

  The housing aspect of 'Rebuilding Rwanda' consists of a prefab housing prototype that would be manufactured in the onsite factory, acting as  a model for future prefab housing developments as well as making it cost-efficient to build additional student housing units for the technical school. 


   The concept of a standardized steel frame makes it feasible to create simple yet versitile modular housing units through a factory production line.

  
   The steel frames can easily stacked to create multi-story housing.  Stacking in this fashion would be ideal for sloped sites such as the urban landscape within Kigali, which is defined by gradual-to-steep sloping hills.


 

Followers